Frequently Asked Questions

Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.

Building Department

15
  • Yes, for overlay or strip and replace, however the code limits roof overlay to a maximum of two layers total.

    Building Department
  • Yes

    Building Department
  • Yes, however, you must follow the most current Building and Energy Codes.  Please call the office for the requirements.  401-348-2547 (U-factor is how well the window insulates. The lower the U-factor the better)

    Building Department
  • Yes, there are two criteria to determined what type of window you may need, it is classified by what wind zone you are in either 110 mph or 120 mph.

    Please call the office for a determination 401-348-2547

    Building Department
  • Yes, a building and zoning permits are required regardless if it is the same size or smaller.

    Building Department
  • No

    Building Department
  •  No, a building permit will only be required if you alter (add or remove an existing wall)

    However a plumbing and electrical permit may be needed if you are adding new electrical or relocating plumbing.

    Building Department
  • No, whether tile, hardwood, vinyl or laminate no permit is needed.

    Building Department
  • Yes

    Building Department
  • Yes, any pool the can hold 24” or more of water is required to have a building and zoning permit.

    Building Department
  •  Yes, building and zoning permits are required.

    Building Department
  • No, however the zoning department has height limits on fences according to your zoning district please contact the zoning office for the proper answer. 401-348-2549 * please be advised we recommend that you install the fence enough on your property that you can perform maintenance without trespassing.

    Building Department
  • Yes, permits are needed for roof mounted and ground mounted arrays. *  Residential ground mounted arrays will need zoning approval, Commercial arrays whether roof or ground mounted  will need zoning and local Fire District approval .

    Building Department
  •  Yes, building and zoning permits will be required.

    Building Department
  • Yes, building and zoning will be needed required.

    Building Department
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow