Cross Street Project

The Cross Street Reconstruction and Improvements Project will entail the installation of a new 8” PVC watermain to replace the outdated existing 6” C.I. watermain; replacement of remaining lead water services within the Town’s right-of-way limits; replacement of the outdated existing stormwater drainage system components; removal & reuse of suitable historic granite curbing & installation of new granite curbing; removal & replacement of existing sidewalk segments with concrete sidewalk surfaces and new ADA accessible ramps; relocation of existing utility poles; removal of existing degraded pavement surface; reprofiling grading of the existing road surface and installation of new pavement surfaces; minor trimming of trees; and installation of new permanent road signage & line striping elements. Work has commenced July 2016 and is anticipated to be completed July 2017.